I/27 Šlovice - Přeštice, bypass

Transport and engineering construction

Description of the building

This is a new construction of the section of road I/27 from the end of the already built four-lane road Litice-Šlovice to Přeštice. The road is designed as a four-lane divided road in category S 21.5/110. At the end of this projected section in the area of the connection MÚK 2 in the section km 10.1-10.2, it transitions to category S 11.5/80. The connection to the existing road network is through two grade-separated intersections. All other direct exits and turns from road I/27 have been eliminated. The length of the newly constructed road is 6.1 km. The construction also included the construction of eight new bridge structures. Additionally, the construction included the construction of new lower-class roads, modifications to existing roads, and the relocation of utility networks.

Financial volume

Approximately 912 million CZK

Implementation

2024

Awards

ČDS&T - Price of the magazine Construction, Public price, jury price

Connect with us and turn your projects into reality.